June 13, 2024
 |
Jeff Holland Jerry Phillips

Jeff Holland, right, was the speaker at a recent Eastern Shore Christian Businessmen’s Association meeting.

Holland, the executive director of the Chesapeake Bay Bridge and Tunnel District since 2005, gave a thorough history of the 17.6 mile span, opened in April of 1964 at a cost of $200 million. Eventually named after Lucius Kellam Jr., the Eastern Shoreman who spearheaded the project, the bridge-tunnel replaced the ferry system that made travel from the Eastern Shore to Hampton Roads time consuming, especially during the holidays. Ongoing construction of a second tunnel under the Thimble Shoal channel was delayed for eight months when it hit a century old anchor. It is now expected to be completed in August of 2027.

At left is Jerry Phillips, president of the ESCBA, which meets monthly to promote Christian principles and ethical decisions in all business dealings.

.

Northampton Driving Tour

Share this

Listen Live!

WESR 103.3FM PLAY BUTTON
COASTAL COUNTRY PLAY BUTTON

Local Weather

June 15, 2026, 6:58 am
Overcast clouds
NNW
Overcast clouds
69°F
20 mph
Apparent: 69°F
Pressure: 1007 mb
Humidity: 85%
Winds: 20 mph NNW
Windgusts: 31 mph
UV-Index: 0.4
Sunrise: 5:40 am
Sunset: 8:25 pm
 

Visit our sponsors

Alexa, enable One Oh Three the Shore Skill

FOLLOW US

OUR ADVERTISERS

Coldwell Banker Harbour Realty

Member of the

esva chamber