The Route 1002 Bridge over Onancock Creek  or locally known as the Bagwell Bridge reopened to traffic on 2/9/18, which was 67 days ahead of the revised completion date. McLean Contracting Company performed the work, which included replacing/repairing both bridge abutments (supports), replacing sheet piling on both sides and repaving both roadway approaches.